Description of Project:

The project includes civil and electro-mechanical work, which consists of 8300 m3 concrete casting, design of utilities, piping network, fabrication, and installation. The capacity of the fuel tank is 4000 m3 to 8000 m3, and installation of 10 gas turbines, including utilities and polishing unit.