Water Supply Improvement Project in Kurdistan Region (Package 4)
Project Name:Water Supply Improvement Project in Kurdistan Region (Package 4)
Client:KRG General Directorate of Water Seerage, contact with Japanese Fund Institute JICA
Start Date:Feb 2021
End Date:Feb 2022
Description of Project:
Upgrade of Sulaimaniyah & Halabja Water Supply System, works include Supply and installation
of Ductile pipes & HDPE Pipes, valves, flowmeters, Solar Energy, Flow & Control System.
The project includes:
LOT 1: To supply and install 17,000 mtr of DN600 Ductile Iron pipe with 20 flow and pressure control chambers, 2 bridge crossing and 1 high way trenchless underpass.
LO2A: Complete water network distribution for city of halabjah, includes HDPE pipe, valve distribution chambers and pressure control chambers.
LOT2B: New flow control system to distribute water to Halabjah, sirwan and said sadik with SCADA control and solar power supply.
LOT 2C: New sludge drainage system, 500 m3 underground concrete tank, 2.5 km of HDPE Drainage pipe and river outfill installation.