Gas Pipe Network

Project Name:Gas Pipe Network

Client:Aggreko

Start Date:Jan 2024

End Date:Feb 2024

Alternate Text

Description of Project:

Our scope of work consisted of precision pipe fabrication, which included cutting, beveling, welding, and valve installation as per design specifications. We constructed robust pipe supports from reinforced concrete and ensured quality through radiographic testing of weld joints. Our pre-commissioning work involved nitrogen flushing and pneumatic pressure testing. We applied specialized paint and thermal insulation, using rock wool and aluminum cladding. Additionally, our team fabricated steel structures for cable tray bridges and platforms, installed and constructed concrete slabs for equipment mounting, and managed earthworks for service water and sewage networks, encompassing excavation and piping. We also provided certified heavy lifting and access equipment, operated by our skilled professionals.


Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE