Cathodic Protection for 60 wells
Project Name:Cathodic Protection for 60 wells
Client:Exxon Mobil
Start Date:Jan 2024
End Date:May 2024
Description of Project:
Our company has successfully completed a cathodic protection project for 60 wells, which included the installation of anodes, power supply, and a solar power system to feed the cathodic protection system. The project involved securing the well head and pipelines against corrosion using a comprehensive cathodic protection setup. We installed steel structure frames and a photovoltaic array consisting of 10 solar panels, complemented by a reliable 12V battery bank with 6 cells to ensure consistent power storage. Our team also implemented an efficient charge controller, along with cable pulling and termination, and earthing system installation. Additionally, excavation and backfilling processes were conducted, and canister anodes were installed to complete the setup, providing long-term protection for the oil well and pipelines.