Technical Control of Detailed Design for Waste Water Pumping Station “Rebnica”, Kraljevo, Serbia

Project Name:Technical Control of Detailed Design for Waste Water Pumping Station “Rebnica”, Kraljevo, Serbia

Client: Agency for Planning and Construction “Kraljevo”

Start Date:December 2005

End Date:February 2006

Alternate Text

Description of Project:

Objectives of technical control were to give professional opinion, comments and suggestions on detailed design for sewage pumping station ”Ribnica ” prepared by the company “Ruding” from Belgrade, Serbia. Technical control Committee members were required to give comments and their suggestions according to Serbian regulation on planning and construction.
Technical control of detailed design for sewage pumping station “Ribnica” covered the following services:
• Detailed evaluation of the Project
o Detailed evaluation of Hydraulic Design
o Detailed evaluation of Mechanical Design
o Detailed evaluation of Electrical Design
o Detailed evaluation of Structural Design
• Professional opinion according to Serbian regulation on planning and construction
• Presentation of comments and suggestions
• Submission of Report on Technical Control to the Client and Consultant
• Approval of the project after removing and adjustment of eventual comments and suggestions by consultant

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE