Preliminary Design – Upgrading of Portable Water Treatment Plants Trand- Novi Sad, Serbia.

Project Name:Preliminary Design – Upgrading of Portable Water Treatment Plants Trand- Novi Sad, Serbia.

Client:JKP Vodovod i Kanalizacija Novi Sad, Serbia

Start Date:July 2005

End Date:November 2005

Alternate Text

Description of Project:

The potable water treatment plant Strand is located in Novi Sad. Plant capacity is 5,400 m3/h of treated water.
Existing plant consists of following processes:
• Aeration with retention for Fe and ammonia removal
• Sand filtration
• Water disinfection
Due to occasional presence of mineral oils and benzene in water, as well as presence of TOC in water, it
is foreseen to upgrade water treatment plant with following process units.
• Main ionization
• GAC adsorption
In addition, UV disinfection will be added to plant to improve water disinfection process.
Description of Actual Services Provided by Voltec:
The Preliminary Design for Upgrading of Potable water treatment plant Strand covers the following services:
• Investigation and evaluation of relevant available data on water quality and plant operation data
• Evaluation of different alternatives regarding the position of ozone in the process line
• Analysis of necessary ozone dosage for removal of Fe, Mn, nitrate and TOC
• Determination of optimum type of ozone generators and GAC
• Process calculations and preparation of technical specifications
• Preparation of drawings and bill of quantities
• Determination of investment costs, operating costs and influence on price of potable water JKP Vodovod i Kanalizacija Novi Sad, Serbia

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE