Pre-Feasibility Study with Basic Design for Improvement of the Water Quality and Portable Water Supply Systems in Kikinda, Zrenjanin, Becej and Novi Becej, Serbia

Project Name:Pre-Feasibility Study with Basic Design for Improvement of the Water Quality and Portable Water Supply Systems in Kikinda, Zrenjanin, Becej and Novi Becej, Serbia

Client:

Start Date:

End Date:

Alternate Text

Description of Project:

Client: Government of federal republic of Germany 
Value: 900,000 Euro

The pre-feasibility study and basic design cover the following services:
Data collection and assessment of present situation in water supply system, establishment of objectives, key steps, general activities and preparation of time schedule, preparation of laboratory investigation works for water quality and implementation program
Review of current law regulations
Analysis of possibility for application of river bank filtration as widely applied German technology for water treatment
Assistance in technical description of water treatment plant and water supply system alternative solutions, preparation of mathematical models for main pipelines
Master plan and Bill of Quantities 
Economic analysis of alternative solutions and selection of the optimal one and conclusions and recommendations

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE