Preliminary Design for Water Supply of Municipalities Nemanovci & Pejicevi Salasi Novi Sad, Serbia

Project Name:Preliminary Design for Water Supply of Municipalities Nemanovci & Pejicevi Salasi Novi Sad, Serbia

Client:JKP Vodovod i Kanalizacija, Novi Sad

Start Date:May 2005

End Date:November 2005

Alternate Text

Description of Project:

Nemanovci and Pejicevi salasi municipalities are located nearby Novi Sad. Potable water in those municipalities is not in accordance with regulations, and the water supply is organized with water trucks which bring potable water form Novi Sad.
The two options were analyzed:
• Connection to the main water pipeline located between Novi Sad –Subotica Road and Novi Sad –Becej road
• Connection to main water pipeline near the Cenej church.
Option two was chosen as technically better and more feasible solution.

Description of Actual Services Provided by Voltec:
• Site Reconnaissance
• Establishment of Project Database
• Analysis of potable water consumption for population and agriculture
• Hydraulic calculations
• Mechanical design
• Power supply and control of the pumps
• Preparation of drawings
• Preparation of the bill of quantities
• Determination of investment costs, operating costs

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE