Final Design of the Water Intake, Treatment Plant, and Pump Stations at the Water Source of the Regional Water Supply System for the Coastal Region of the Republic of Montenegro

Project Name:Final Design of the Water Intake, Treatment Plant, and Pump Stations at the Water Source of the Regional Water Supply System for the Coastal Region of the Republic of Montenegro

Client:Public Enterprise for Water Supply, Waste Water Treatment and Drainage and Solid Waste Disposal “Crnogorsko Primorje” - Budva

Start Date:April 2007

End Date:November 2007

Alternate Text

Description of Project:

Assignment Title: Final Design of the Water Intake, Treatment Plant, and Pump Stations at the Water Source of the Regional Water Supply System for the Coastal Region of the Republic of Montenegro
Associated Firm(s): Scott Wilson, UK
Narrative Description of Project:
Regional Water Supply System (RWSS) consists of water intake, water treatment plant (WTP), treated water pumping station and water transmission pipeline. The water transmission pipeline is divided into 2 parts: continental part and coastal part (northern and southern part). In the system are foreseen several break pressure tanks (BPT), pumping stations (PS) and reservoirs BPT and PS Station Reljici, Reservoir
Djurmani with chlorine station for post disinfection, Northern part of transmission pipeline from reservoir
Djurmani to PS Budva with post chlorination station in Budva, Southern part of transmission pipeline from reservoir Djurmani to PS Belveder with post chlorination station in Belveder. According to the Preliminary Design for Regional Water Supply System for Coastal area in Montenegro following structures are foreseen: Water intake at the water source site, raw water pumping station, pressure filters, UV disinfection, pumping main to the treated water reservoir, transmission pipeline to the break pressure tank PK1 and transmission pipeline to the Pumping Station Reljici. Detailed investigation program in the period of 2005 -2007 confirmed excellent water quality, enough water quantity and geological and geotechnical characteristics of the soil. Investigation works served for determination of the process treatment. The Plant is for design period of 30 years, with 1500 lit/s for final stage.
Description of Actual Services Provided by Voltec:
• Site Reconnaissance
• Establishment of Project Database
• Data Collection Memorandum
• Supervision of investigation works on the water source: water quality, water source capacity, determination of zones for sanitary protection of the source
• Process calculations and preparation of technical specifications
• Hydraulic calculations
• Power supply and automatisation of the plant
• Preparation of drawings and bill of quantities
• Determination of investment costs, operating costs and influence on price of potable water
• Estimation of Total Cost of the Works
• Contract Administration and Project Management

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile

DOWNLOAD PROFILE