Feasibility Study and Preliminary Design of Waste Water Treatment in Veliko Selo-Beograd, Serbia

Project Name:Feasibility Study and Preliminary Design of Waste Water Treatment in Veliko Selo-Beograd, Serbia

Client:Agency for Construction and Land Development of Belgrade, Serbia

Start Date:December 2004

End Date:December 2006

Alternate Text

Description of Project:

The central sewerage system of Belgrade consists of several main trunks, pumping stations and Interceptor. The wastewater from the Central Sewerage System will be treated on the WWTP Veliko Selo. It is located on the bank of the Danube River. The plant is designed for final stage and a total of 1,6 mil Population Equivalents. Today, municipal and industrial wastewater is discharged without treatment into the Danube River. In the future, the entire wastewater of Belgrade shall be treated in compliance to the European Union guidelines.

Scope of activities and project objectives are:
• Optimization of micro location of the plant
• Technical assistance to the client for financial sources identification
• Professional assistance to the client in project organization
• Project plan preparation
• Establishment of different technical alternatives and their optimization
• Preparation of programs for investigation works
• Preparation of environmental impact assessment study

Description of Actual Services Provided by Voltec:
The feasibility study for the wastewater treatment plant Veliko Selo covers the following services:
• Investigation and evaluation of relevant planning data
- Wastewater quantities and pollution load
- Data and boundary conditions of the planned drainage system
- Geological and soil-mechanical data
- Hydro-logic data (water levels of the Danube for different discharge occurrences)
• Evaluation of different process alternatives: Conventional Activated Sludge Process, Bio aerated Filtration and SBR technology & two alternatives for sludge treatment were analyzed: Anaerobic Sludge Treatment with biogas production and Sludge Incineration
• Determination of investment costs, operating costs wastewater tariffs, & economic analysis
• Proof of the feasibility and investigation of applicable financial models
• Preparation of preliminary design for chosen process alternative

Alternate Text

Our Partners

Alternate Text
AGRU PIPE
FLOWORK
Klinger Gaskets
CPS Generators
US PIPE
DAB Pumps
TSI Limited
VAG
IKConseng
FGWilson
LucyElectric
Brush

Voltec Engineering’s multidisciplinary approach represents one focal point with an expert team to cover all your professional needs. For more information about us, please download our company profile