Feasibility Study and Preliminary Design of Waste Water Pumping Station Krnjaca - Beograd, Serbia
Project Name:Feasibility Study and Preliminary Design of Waste Water Pumping Station Krnjaca - Beograd, Serbia
Client:
Start Date:
End Date:
Description of Project:
Client:
Agency for Construction and Land Development of Belgrade, Serbia
Start
Date (Month/Year): November 2004
Completion
Date (Month/Year): February 2006
Staff
Number: 13
Narrative
Description of Project:
The
suburb Krnjaca is situated northerly of the Belgrade city on the northern
Danube bank. The waste water of this small town, which will have approx.100,000
inhabitants, is discharged without treatment into the Danube. The drainage
system of Krnjaca exists rudimentarily and dewatered to the bank area of the
Danube. The first step is design of raw wastewater and treated water pumping
station. Design of wastewater treatment plant is not in the scope of this
project within the scope of the project work, and the most feasible pumping station
design is chosen.
Description
of Actual Services Provided by ITSC:
The feasibility study and preliminary design for the wastewater pumping station
Krnjaca covers the following services:
•
Investigation and evaluation of relevant planning data
-
Wastewater quantities
-
Data and boundary conditions of the planned drainage system
-
Geological and soil-mechanical data
-
Hydro-logic data (water levels of the Danube for different discharge
occurrences)
•
Evaluation of different alternatives regarding the local conditions
•
Determination of investment costs and operating costs , Proof of the
feasibility
•
Preparation of preliminary design for chosen alternative for raw wastewater and
effluent pumping